Hornsea 1 Export cables
Optalay’s CoreTEST system was used onboard DEME group’s Living Stone for continuous
monitoring during load out at Karlskroner and during cable laying operations at the Hornsea
OWF.
Elia Mog Export cables
Optalay’s CoreTEST system was used onboard DEME group’s Living Stone for continuous
monitoring for the load outs at Fulgor Hellenic cables and during cable laying operations at the
Elia Mog platforms.
Borssele 1,2,3,4
Optalay’s CoreTEST system was used onboard Boskalis’s Giant 7 for continuous monitoring
during cable laying and trenching operations.
Rampion
Optalay’s CoreTEST system was used onboard Assodivers Atalanti cable laying vessel for
continuous monitoring of the Fulgor Hellenic export cable during installation.
A CoreTEST system was also installed at the Twineham onshore substation for continuous
monitoring during trenching operations and on the dark fibres thereafter.